One-story brick house corner beside a deep, mown lawn, with mature trees and foundation plantings.

Brentwood's $150 Infill Permit: What Teardown Buyers Should Know

August 13, 2026

"There is a significant trend that when new homes are being built on existing lots where old houses were, the new houses are larger."

— Jason Gage, as quoted by the Williamson Herald

Gage was speaking to the Board of Commissioners on June 8, 2026, about a pattern his own engineering staff had been tracking for months. He was not describing a mood or a marketing trend. He was explaining why the city just created an entirely new permit, one that did not exist before June 8, 2026, as the Williamson Herald reported.

If you have been eyeing a rancher on Granny White Pike or a split-level in Brentwood Hills as your way into an acre-plus lot in a city with almost no raw land left, this is a permitting detail worth factoring into the deal.

What actually passed

On June 8, 2026, the Board of Commissioners approved a set of zoning and stormwater amendments that formally establish a Residential Infill Development Permit, or RIDP, along with its fee structure. According to the City of Brentwood's June 4 briefing, city engineering staff pointed to a fee near $150 for the permit itself. The reasoning traces back further, to a presentation staff gave in May using teardown-rebuild data from the Meadow Lake neighborhood as the working example.

The gap they were closing is a specific one. Under Brentwood's existing code, a typical teardown-and-rebuild project increases the impervious surface on a lot, more roofline, more driveway, more patio, but usually stays under the threshold that triggers a full grading permit with engineering review. Staff described it plainly in the June 4 briefing: these projects add impervious area, but "they don't really get caught up into the full-blown engineering review." The RIDP exists to catch what the grading permit process was never built to catch.

Mayor Nelson Andrews framed the timing for commissioners this way, according to the Williamson Herald's coverage of the vote: the point is to look down the road before this becomes a problem, not after. Commissioners Kim Gawrys, Janet Donahue, Stevan Pippin, Anne Dunn, and Ken Travis voted to approve. Vice Mayor Rhea Little was absent for the vote.

The context that made this necessary

Brentwood is a city built out. City staff noted during the June 4 briefing that the community is roughly 89 percent residential based on a 2013 study, and that many of its subdivisions date to the 1980s and early 2000s, well before the city's current stormwater quality and quantity control standards existed. The streets where the teardown activity is actually concentrated skew even older than that citywide figure.

Granny White Pike carries an average lot size just over three acres and an average build year of 1976. Brentwood Hills dates to the mid-1960s, with lots running from under an acre to well over three, and no HOA to slow down what gets built on them. Wildwood Valley was developed between the mid-1960s and mid-1970s. Brentwood Estates, off Wilson Pike, dates to the late 1960s. These are not new subdivisions with modern stormwater engineering baked into every lot grade. They are 50-plus-year-old streets where a half-acre of new roofline and driveway can send water downhill into a neighbor's yard, and the new permit adds a review of where that water goes.

What the permit actually asks for

Per the staff presentation covered by Citizen Portal's summary of the May 7, 2026 commission discussion, the RIDP is tiered, and it requires on-lot stormwater measures for substantial rebuilds, things like rain gardens, infiltration trenches, or documented maintenance agreements tied to the property. Staff also confirmed that many rebuilt homes push right up against maximum building-coverage limits while technically still providing enough green space on paper, which is exactly the kind of project the permit is built to catch before it becomes a downstream drainage complaint from a neighbor two lots over.

When a commissioner asked directly whether there was a maximum allowable square footage for a given stormwater solution, staff's answer was that it depends on what system the builder proposes, engineered infiltration, a piped discharge, or something in between, and each gets evaluated on its own plan. This is a permit built around case-by-case engineering judgment, not a flat table you can look up in advance.

Why $150 is the wrong number to focus on

Set the RIDP fee next to what a teardown in Brentwood already costs before a shovel touches the ground. According to tnimpactfees.com, Williamson County's privilege tax and Education Impact Fee together routinely clear $19,000 to $20,000 per unit before the city ever collects a permit fee, and the Education Impact Fee climbs as high as $12,399 on homes at 3,400 square feet and above. Against that backdrop, a $150 line item is not the cost that should worry a teardown buyer.

The real cost is what the permit requires you to prove. An engineered rain garden or infiltration trench means hiring someone qualified to design and test it, which adds time and a line item most buyers never budgeted for when they penciled out the land value on an old Brentwood lot.

Custom construction in Brentwood already runs $350 to $600 per square foot once land, luxury finishes, and site conditions are factored in. Add engineered stormwater design and a documented maintenance obligation, and the teardown math that made sense on a spreadsheet in April looks a little different in July.

What this means if you are underwriting a teardown lot

A few things worth doing differently starting now, if you are looking at an original-vintage home on a large Brentwood lot as a rebuild opportunity:

  1. Get a site and stormwater engineer involved before you finalize architectural plans, not after.
  2. Ask directly, of the seller, the builder, or the city's planning and codes office, whether the parcel's impervious coverage history has ever been documented. Older lots on Granny White Pike, in Brentwood Hills, or in Wildwood Valley may already sit close to coverage limits from additions nobody tracked closely.
  3. Keep the maintenance agreement in mind as you plan for a future resale.
  4. Pad your permitting timeline. Even at a $150 fee, this is a new layer of city review that did not exist before June 2026

What it means if you already own the lot

If you own an original home on an acre-plus lot in one of these older Brentwood neighborhoods and have been weighing a sale to a builder or an investor, the RIDP does not change what your land is worth. Recent closings still tell that story clearly: a 2024-built home on a 1.93-acre lot in Brentwood Hills closed at $3,256,825, and Wildwood Valley has seen rebuilds close as high as $4,350,000 on lots that once held modest 1960s ranches. What changes is the conversation buyers and their builders will have before they write an offer. Expect more questions about coverage history, more site visits before due diligence ends, and a permitting process that a well-prepared seller can speak to instead of leaving as a surprise.

FAQ

Does the RIDP apply if I am only adding a room, not tearing the house down? An early conversation with the city's planning and codes office is worthwhile before you assume you are exempt.

Does this apply outside Brentwood's city limits, in unincorporated Williamson County? The ordinance is a City of Brentwood regulation, adopted by the Brentwood Board of Commissioners. For a parcel outside Brentwood, check with the relevant local office about the rules that apply.

Where to start

None of this means a Brentwood teardown stopped making sense in June 2026. It means the spreadsheet needs one more line than it did in May. If you are weighing whether an old lot on Granny White Pike or a fixer in Brenthaven still pencils out once you account for stormwater engineering and a documented maintenance obligation, that is exactly the kind of underwriting conversation worth having before you write an offer, not after.

Dawn Cassara works these Brentwood streets closely enough to know which lots carry old additions nobody tracked and which sellers have already had the stormwater conversation with the city. Start with a clear picture of what your current lot, or the one you are watching, is actually worth today, permit changes included.

This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.

Work With Dawn

Dawn Cassara is dedicated to delivering exceptional real estate experiences with a personalized approach. Her expertise and commitment ensure clients achieve their goals seamlessly.